![]() |
|
Home Page
Register to Work Find Project Family Bio Lex HFH Schedule (Updated 6/30/08) Photos (Won't work with IE 6) Floor Plans First Floor Second Floor Elevations |
Photos From 2007 Lexington Methodist Habitat ProjectWeek/Ending August 11, 2007![]() Getting Ready
Planning
Pause Before Work
Squad Ready for Inspection
Framing Walls
When do I get to hammer?
A Well Attached Footer
Laying Down Those Studs
Chop Saw at Work
Outside Panel on Walls
Outside Panels Ready for Nails
Raising the Walls I
Raising the Walls II
Walls Raised!
Braced
An Endless Supply of Nails
Back Wall Up
Front Wall Up
Must Be Lunch Time
Roof Time
Styrofoam
Roof Up; Interior Framing Being Discussed
The Project Sign
Decking the Roof
|
|
Lexington United Methodist Habitat Build For Information, click for addressed Email form: |
|